Bottom line: On Lake Conroe the San Jacinto River Authority controls the land up to the 201-foot contour, so a private dock, boathouse or lift needs its license and a yearly fee of $0.188 a square foot, $60 at least, and a bulkhead needs its own permit.

Who controls the shoreline below 201 feet on Lake Conroe?

The San Jacinto River Authority, which built the lake in a joint venture with the City of Houston and runs the dam. Its rules for the lake, effective June 1, 2015, define Authority Land as property it owns or controls to run the dam and reservoir, including land that is, may be or has been under the lake, and the land next to it up to a contour line 201 feet above mean sea level. That line is the lake's normal level, which the authority calls its normal conservation pool.

So under those rules the ground below the 201-foot line, and anything built out over the water from it, is the authority's to permit. The rules say the right to build and keep docks, bulkheads and other structures there "is not an inherent right that comes with the control or ownership of waterfront property." Building or keeping one without a valid permit is a violation, and the authority can make the owner remove an unpermitted structure at the owner's own cost.

What does a dock, boathouse or lift need before it is built?

A residential license from the authority. The rules call a privately owned dock, pier, wharf, floating structure or any other structure for mooring or storing a boat a private structure, and the authority's residential page lists what an owner sends in: a residential license agreement signed by the homeowner (a contractor's or builder's signature is not accepted), and plans drawn to scale with accurate measurements, showing where the structure sits on the property and how far it is from the neighboring lots. Where the subdivision requires it, the plans also need approval from the homeowners association, property owners association or architectural control committee.

The authority then approves the structure or says why it will not. Once it is approved, the owner pays the fee, and the authority issues a construction permit to the owner and the contractor, which must be on display for the whole job. Applications, questions and payments go through the authority's customer portal, which it launched in 2024. The license can be revoked, so it is a permission the owner keeps up rather than a right that comes with the deed.

What is the yearly fee for a dock on Lake Conroe?

The authority's rate schedule, adopted by its board on September 1, 2010, sets the residential structure fee at $0.188 per square foot per year, with a $60 minimum a year. Its guide to measuring a structure explains how the square footage is taken: the part that reaches out over the water past the bulkhead is measured at full pool, whatever level the lake is at that day, and the boat slips count even where no deck covers them.

A structure cut into the owner's land, meaning surrounded by land on three sides, is not measured and pays the $60 minimum. A structure that is partly cut in pays on the part that extends past the bank. The guide's own worked examples come to $141.00 a year for a dock built out over the water and $116.40 a year for one that is partly cut in.

San Jacinto River Authority fees for residential structures on Lake Conroe, from its rate schedule adopted September 1, 2010 and its measuring guide.
StructureHow it is measuredYearly fee
Dock or boathouse built out over the waterIts whole footprint past the bulkhead, at full pool, slips included$0.188 per square foot, at least $60
Partly cut into the bankOnly the part that extends past the bank, at full pool$0.188 per square foot, at least $60
Cut in, with land on three sidesNot measured$60

What does a bulkhead permit on Lake Conroe take?

Its own permit, separate from the dock license. The authority's rules make it a violation to install, reinstall, replace or change a bulkhead in the lake or on its land without one, and its bulkhead page asks for an existing survey of the property, with metes and bounds, by a registered professional land surveyor; the proposed bulkhead marked on that survey; construction plans; the materials identified; and the bulkhead's placement against the property lines shown clearly. Where the bulkhead would sit on the authority's property, the owner must also show permission for that encroachment.

Any later change or addition to a permitted bulkhead goes back to the authority's operations department for approval. Dredging, digging or filling in the lake or on its land needs a permit of its own, and the rules require any dredging, filling or bulkhead work to meet the regulations and permits of the U.S. Army Corps of Engineers' Galveston District as well. The authority's list of lake facts puts the average bulkhead at an elevation of 203 feet above mean sea level, two feet above normal pool.

Does the river authority keep the lake at a level that suits a dock?

No. Its rules say the authority is under no obligation to keep the lake at any particular level so that private structures can be built or used, and its dock and bulkhead pages say the same. The general manager may also limit building or use by permit when the lake level changes, for public health and safety, or in an emergency.

The lake does move. The authority's own records put its lowest level at 192.68 feet on December 2, 2011, 8.32 feet below normal pool, and its highest at 206.24 feet on August 28, 2017. How far the lake is lowered ahead of storms, and who decides, is on the page about Lake Conroe's water level and the lowering policy.

What is the 207-foot flowage easement?

It is the band of land around the lake that the water can rise into during a storm. The authority's list of lake facts gives the flowage easement as 207 feet above mean sea level, the area the lake level can rise into during a rainfall event, six feet above normal pool. Its rules treat that band differently from the land below 201 feet: Authority Land generally does not include flowage easements and similar rights to cover land above 201 feet for a time.

For a buyer, the easement is a second line to find on the survey. The lot's elevation against 207 feet says whether that part of it lies where the lake can rise in a storm, and the lake's record of 206.24 feet came within a foot of the line.

Structures built inside the authority's easements have their own process. On July 24, 2025 its board amended its policy on encroachments on easements around the lake: an owner can ask the authority to sign an easement encroachment agreement, filed in the county's official records, for a structure already there or for permission to build in the easement. The minutes give the total reimbursement as ,015 for a revocable agreement and ,970 for an irrevocable one, and record the general manager saying the aim is to clear the owner's title.

What else near the water does the river authority permit?

Septic systems. Under its rules, an on-site sewage facility within 2,075 feet of the lake is regulated and permitted by the authority, under an order its board adopted on February 26, 2004, and sewer lines over the lake or on its land fall under the same chapter of the rules as docks. For a lakeside house on septic, the system's permit is the authority's to ask about.

What should a buyer ask for before buying a house with a dock?

The paper for each structure. That means the authority's license and construction permit for the dock, boathouse or lift, the bulkhead permit, the owners association or architectural committee approvals where the subdivision required them, a record that the yearly fee is paid, and any easement encroachment agreement recorded against the lot. The survey should show the 201-foot line, the 207-foot line and where every structure sits against the property lines.

Ask for these during the option period, the days after signing when a buyer can still back out for the option fee, so a structure with no permit on file is found while the buyer can still walk away.

What does this page leave open?

What a bulkhead costs to build or repair: the authority publishes no figure, and this page has no source for one. It also leaves open whether any one structure is licensed and paid up, which the authority's records and the seller's papers answer, and what the Army Corps of Engineers requires for a particular job.

Questions & answers

Lake Conroe questions, answered

Can I build on the shoreline in front of a Lake Conroe waterfront lot?

Only with the San Jacinto River Authority's permit. Its rules for the lake, in force since June 1, 2015, treat the land that is or has been under the lake, and the land beside it up to the 201-foot contour, as Authority Land. Owning the lot does not bring a right to build there, so every dock, bulkhead or boathouse on that land needs the authority's permit.

The 201-foot contour is the lake's normal level. The authority can require an unpermitted structure to be removed at the owner's cost, and it can revoke a permit. Above 201 feet it holds a flowage easement up to 207 feet, the band the lake can rise into in a storm, which the rules treat separately. A lot's survey shows where both lines fall.

What do I need to build a dock or boathouse on Lake Conroe?

A residential license from the San Jacinto River Authority. The homeowner signs the license agreement, since a contractor's or builder's signature is not accepted, and sends plans drawn to scale showing where the structure sits and how far it is from the neighboring lots. Where the subdivision requires it, the owners association or architectural committee must approve the plans first.

Once the authority approves the structure, the owner pays the fee and receives a construction permit, which must be displayed for the whole job; work may not start without it. Applications and payments go through the authority's online customer portal, launched in 2024. The license can be revoked, so a buyer of a house with a dock should ask the seller for the license and the permit it was built under.

How much is the yearly fee for a private dock on Lake Conroe?

The San Jacinto River Authority charges $0.188 per square foot a year for a residential structure, with a $60 yearly minimum, under the rate schedule its board adopted on September 1, 2010. The square footage is taken at full pool, whatever the lake's level that day, and boat slips count even where no deck covers them.

A structure cut into the owner's land, with land on three sides, is not measured and pays the $60 minimum; a structure partly cut in pays only on the part that extends past the bank. The authority's own measuring guide works two examples: $141.00 a year for a dock built out over the water and $116.40 for one partly cut in. Fees are paid through the authority's customer portal.

Do I need a permit to build or replace a bulkhead on Lake Conroe?

Yes. The San Jacinto River Authority's rules make it a violation to install, reinstall, replace or change a bulkhead in the lake or on its land without a permit, separate from any dock license. The application needs a registered land surveyor's survey with metes and bounds, the new bulkhead marked on it, construction plans and the materials to be used.

Where the bulkhead would sit on the authority's property, the owner also shows permission for that encroachment, and any later change goes back to the authority's operations department. Dredging or filling needs its own permit, and the rules require dredging, filling and bulkhead work to meet the U.S. Army Corps of Engineers' Galveston District rules too. The authority publishes no figure for what a bulkhead costs to build.

What is the 207-foot flowage easement on Lake Conroe?

It is the band of land around Lake Conroe that the lake can rise into during a storm. The San Jacinto River Authority lists its flowage easement at 207 feet above mean sea level, six feet above the lake's normal level of 201 feet. The authority's rules treat that band separately from the land below 201 feet, which the rules count as the authority's land.

The lake's highest recorded level, 206.24 feet on August 28, 2017, came within a foot of the easement line. A buyer can read the lot's elevation against 207 feet from the survey or an elevation certificate, which shows whether part of the lot lies where the lake can rise. Whether a lender requires flood cover is a separate question, answered by the lot's FEMA map.

Your next step

Wondering what your Lake Conroe home is worth?

Ask for a valuation grounded in current Lake Conroe sales, or put time on Kim Vargas's calendar to talk through a purchase or a sale.

Book an intro call

Your details go only to Kim Vargas and are used only to prepare your Lake Conroe valuation.